Sample interview questions: Can you explain the process of pipefitting in a new construction project versus a renovation project?
Sample answer:
Pipefitting in New Construction
- Planning and Design: Work closely with architects, engineers, and contractors to determine the layout and specifications of the piping system.
- Material Selection: Select appropriate pipe materials (e.g., copper, PVC, CPVC) based on system requirements and industry standards.
- Installation: Install piping according to plans and codes, using specialized tools and techniques to ensure proper alignment, support, and connections.
- Testing and Commissioning: Conduct pressure and leakage tests to verify system integrity. Balance the system to optimize flow rates and energy efficiency.
Pipefitting in Renovation
- Assessment and Modification: Inspect existing piping systems to identify areas of deterioration or inadequacy. Determine required modifications or upgrades based on new requirements or code changes.
- Removal and Replacement: Safely remove old piping and fixtures as necessary. Install new pipes and components to replace or repair the existing system.
- … Read full answer
Source: https://hireabo.com/job/12_0_6/Pipefitter