Planning and Design:
- Conduct site surveys to determine optimal turbine placement and grid interconnection points.
- Design and implement electrical distribution systems, including underground cabling, transformers, and switchgear.
- Comply with all applicable electrical codes and industry standards, including IEC 61400 and UL 1563.
Installation and Commissioning:
- Install turbines according to manufacturer specifications, including tower erection, nacelle mounting, and electrical connections.
- Install and configure control systems, SCADA networks, and remote monitoring infrastructure.
- Perform commissioning tests to verify proper operation and compliance with safety regulations.