Sample interview questions: Can you explain the process of testing and commissioning plumbing systems after installation?
Sample answer:
Testing and Commissioning Process:
-
Pre-Testing:
-
Verify the adequacy of pressure and flow capabilities.
- Inspect visual aspects of fixtures, fittings, and piping for leaks or defects.
-
Check for proper drainage and venting.
-
Water Pressure Testing:
-
Fill the system with water and pressurize it to a designated test pressure (e.g., 150 psi).
- Monitor pressure for leaks or drops, using a pressure gauge or hydrophone.
-
Inspect all joints, connections, and valves for signs of leakage.
-
Flow Rate Testing:
-
Determine the maximum flow rate at various fixtures and outlets.
- Compare the measured flow rates to design specifications.
-
Ensure adequate flow for proper fixture operation and water distribution.
-
Drainage and Venting Testing:
-
Fill fixtures with water and observe for proper drainage.
- Check for air flow in vents by using a smoke test or equivalent method.
-
Verify that vent pipes meet code requirements for size and termination.
-
Backflow Prevention Testing:
-
Test all backflow prevention devices (e.g., check valves, backflow preventers) to ensure proper operation…. Read full answer
Source: https://hireabo.com/job/12_0_8/Plumbing%20Designer