Can you explain the process of testing and commissioning plumbing systems after installation?

    Unlocking the Secrets of Skilled Professions

    Sample interview questions: Can you explain the process of testing and commissioning plumbing systems after installation?

    Sample answer:

    Testing and Commissioning Process:

    1. Pre-Testing:

    2. Verify the adequacy of pressure and flow capabilities.

    3. Inspect visual aspects of fixtures, fittings, and piping for leaks or defects.
    4. Check for proper drainage and venting.

    5. Water Pressure Testing:

    6. Fill the system with water and pressurize it to a designated test pressure (e.g., 150 psi).

    7. Monitor pressure for leaks or drops, using a pressure gauge or hydrophone.
    8. Inspect all joints, connections, and valves for signs of leakage.

    9. Flow Rate Testing:

    10. Determine the maximum flow rate at various fixtures and outlets.

    11. Compare the measured flow rates to design specifications.
    12. Ensure adequate flow for proper fixture operation and water distribution.

    13. Drainage and Venting Testing:

    14. Fill fixtures with water and observe for proper drainage.

    15. Check for air flow in vents by using a smoke test or equivalent method.
    16. Verify that vent pipes meet code requirements for size and termination.

    17. Backflow Prevention Testing:

    18. Test all backflow prevention devices (e.g., check valves, backflow preventers) to ensure proper operation…. Read full answer

      Source: https://hireabo.com/job/12_0_8/Plumbing%20Designer